Case Study - BSF Project (Brumby), North Lincs
Located in North Lincolnshire, we have had the great pleasure in supplying 833 sq. m of Modular Buildings and ancillary toilet and changing room facilities to a well established school. These prefabricated buildings provide 5 No. double classroom blocks, a staff room, library and full administration block enabling an aging and battle scarred school to be demolished and rebuilt without disruption to the academic calendar. Manufactured, delivered and commissioned within a 10 week time frame, it enabled the facility to be operational by the end of the summer term allowing the old school to be demolished during the holiday period (thankfully in the absence of children). Once the new school building has been completed the Modular Buildings will be relocated to another school enabling another refurbishment to commence. Helping education reach the next level!
|
 |